Sites — multi-vendor estate
Active Faults — by severity
Energy Share — by vendor (30d)
Comfort — by site (24h)
Equipment — select to view live points
Points
| Point | Value | Vendor name | Control | Alert |
|---|---|---|---|---|
| Select equipment from the tree. | ||||
Active Alerts
View all →Select equipment to see its active alerts.
Alarms — FDD across all vendors
| Sev | Finding | Site | Vendor |
|---|
FDD Summary
Open Work Orders
| Pri | Task | Site |
|---|
Custom Alarm Rules — thresholds
| Rule | Condition | Sev |
|---|
Anomaly Detection — statistical, 6h baseline
| Point | Equipment / Site | Value | z |
|---|
ESG Summary — 30 days
| Site | Energy (kWh) | Cost | Carbon (kgCO₂e) | Peak (kW) | EUI (kWh/m²) |
|---|
Benchmarking & Savings (M&V) — weather-normalized vs baseline
| Site | EUI | Weather-norm | Target | Baseline | Savings | HDD/CDD |
|---|
Demand & Peak — peak kW, load factor, 24h load profile
| Site | Peak kW | Avg kW | Load factor | Limit |
|---|
Daily Carbon — kgCO₂e by site
Normalization Explorer — how each vendor's raw points map to the unified model
| Vendor | Raw vendor name | Raw ref | Canonical name | Unit | Tags |
|---|
Building:
Legend — equipment abbreviations
AHU · RLT — Air Handling Unit
CH · KAE · Chiller — Chiller (cooling plant)
BLR · KES · Boiler — Boiler (heating plant)
VAV — Variable Air Volume terminal
FCU — Fan Coil Unit
Zone · Raum — Zone / Room
OT — Operating Theatre · ICU — Intensive Care Unit
MSB · Zähler · Main Incomer — Electrical Meter / Switchboard
FACP · BMZ · Fire Panel — Fire Alarm Control Panel (incl. electric / diesel / jockey pumps)
DW · TWW · Domestic Water — Fresh / Domestic Water (tank, booster, metering)
ACS · ZUT · Access Control — Door Controllers / Card Readers
CCTV · VID — Video Surveillance (cameras, NVR)
ELV · AUF · Elevator — Lift / Vertical Transport
CRAC — Computer-Room A/C (precision cooling) · UPS · USV — Uninterruptible Power Supply
PDU — Power Distribution Unit · GEN · NOT — Standby Generator · ENV — Aisle Environment / Leak
Status
Normal / online
2Active alarms on the item
Vendor naming differs — SAUTER uses German codes (RLT, KAE, BMZ…), Honeywell uses Niagara codes (AHU, CH, FACP…), Schneider uses full English. Rosetta normalizes them all to one model.
Historical Trends — any normalized point, any vendor
Comfort by Site — 24h compliance
| Site | Comfort | Zones |
|---|
Overall Comfort Index
Zones — temperature band & CO₂ compliance (last 24h)
| Zone | Site | Temp % | CO₂ % | Overall |
|---|
Asset Register — health, runtime, next service
| Equipment | Site | Health | Runtime 7d | Frequency | Next service |
|---|
Detail
Select an asset to view its maintenance timeline.
Work Orders — any device
| Pri | Task | Status |
|---|
Work order detail
Select a work order to manage replacement parts and complete it.
Parts Inventory — stock & reorder
| Part # | Description | For | Cost | Stock |
|---|
PM Schedule & Timeline — how often each machine is serviced + what's next
| Equipment | Site | Frequency | Last service | Next due | Status | Action |
|---|
Maintenance History — recent work across the estate
| Date | Equipment | Type | Summary | Parts replaced | Cost | Tech |
|---|
Data Quality — normalized coverage
Define New Element — custom equipment or virtual points
Delete equipment:
Sites & Settings — add a building, edit tariff / EUI / carbon (admin)
| Site | Tariff | Target EUI | Carbon % |
|---|
Connectors & Integration — define the BMS API per building: vendor, protocol, driver, transport & endpoint (admin)
| Vendor | Building | Protocol | Driver | Endpoint | Transport | Status | Points | Fresh |
|---|
Users & Roles — admin
| Name | Role |
|---|
Occupancy Schedules — per-site occupied hours & setpoints
| Site | Days | Occupied hours | Occupied °C | Setback °C |
|---|
Audit Log — control actions
| Time | Actor | Action | Target |
|---|
Settings — configure Rosetta
Jump to any configuration area, set org-wide defaults, or personalize your own experience.
Global Defaults — org-wide (admin)
My Preferences — personal, saved on this device
Automation Rules — IF inputs THEN outputs, across any vendor
Building Scorecards — ranked composite performance
| # | Site | Score | Grade | Energy | Comfort | Reliability | Faults |
|---|
Portfolio Map
Prioritized Opportunities — ranked by avoidable cost
| Pri | Issue | Site / Equipment | Category | Avoidable/yr |
|---|
Savings by Category
Select an opportunity to see the recommendation.