Overview

Sites — multi-vendor estate

Active Faults — by severity

Energy Share — by vendor (30d)

Comfort — by site (24h)

Equipment — select to view live points

Points

PointValueVendor nameControlAlert
Select equipment from the tree.

Active Alerts

View all →
Select equipment to see its active alerts.

Alarms — FDD across all vendors

SevFindingSiteVendor

Alarm Analytics — 30 days

FDD Summary

Open Work Orders

PriTaskSite

Custom Alarm Rules — thresholds

RuleConditionSev

Anomaly Detection — statistical, 6h baseline

PointEquipment / SiteValuez

Active Suppressions — maintenance windows that silence matching findings

Create suppressions from an alarm's detail (“Suppress…”). They auto-expire; cancel early below.
ScopeRuleReasonUntil
Building:

Spatial hierarchy — building · floor · zone

Relationship graph — plant → air → terminal → zone (click a node to inspect)

Building:

Upload a floor-plan image, then use “Add marker” and click the plan to drop equipment markers. Markers turn red when their equipment has active alarms.

Spaces & Booking — rooms & desks · 7-day utilization

Building:
SpaceTypeCapacityUpcomingUtilization (7d)
Select a building.

Upcoming Bookings

WhenSpaceTitleBy
No upcoming bookings.

Command Center — governed supervisory writes

Every setpoint/override is requested, approved, executed, verified against read-back, and reversible. All actions are audited.
PointTargetStateRequested by

Lifecycle

pending → executed → verified · with rollback to the captured prior value at any point.

ESG Summary — 30 days

SiteEnergy (kWh)CostCarbon (kgCO₂e)Peak (kW)EUI (kWh/m²)

Daily Carbon — kgCO₂e by site

Carbon — Scope 1 / 2 / 3 — GHG Protocol · 30 days · net-zero trajectory

SiteScope 1 (tCO₂e)Scope 2Scope 3Total

Disclosure & Compliance Exports — framework-formatted ESG reports (PDF / CSV)

Framework: ⤓ PDF

Benchmarking & Savings (M&V) — weather-normalized vs baseline

SiteEUIWeather-normTargetBaselineSavingsHDD/CDD
⤓ Monthly PDF report

Scheduled Reports — email a report on a cadence

NameReportCadenceRecipientsLast sentStatus
Loading…

Cost Breakdown — time-of-use energy + demand charges, last 30 days

Building: Tariff:
Select a building.

Tariffs — time-of-use rates & demand charges

Tenant Billing — allocate energy cost to occupants by sub-meter

Building:
Occupant / leaseContactSub-meters
Select a building.

Utilities — electricity, water, heat & gas across the estate

BuildingElectricity (30d)WaterHeatGas
Loading…

Water/heat/gas are read from M‑Bus / metering points (latest readings); electricity is the trailing 30‑day total.

Weather normalization & M&V — degree-days (Open-Meteo) · IPMVP baseline savings

Loading…

Demand & Peak — peak kW, load factor, 24h load profile

SitePeak kWAvg kWLoad factorLimit

Demand Response — schedule load-shed events & stage governed setpoint setbacks

EventScopeWindowTargetStatus
Loading…

Optimal Start/Stop & Setpoint Reset — recommended control changes with estimated savings

EquipmentSiteRecommended actionskWh/moCost/mo
Window: Rank by:
⤓ CSV

Yield vs Guarantee — daily portfolio production against the contracted curve

Site League Table — ranked on weather-normalized performance

#SiteESCOkWpEnergyPREPIkWh/kWpAvail.LostSavings

ESCO Performance — portfolio share by contractor

ESCOSitesEPILost
Site: Window:

Performance Trend — PR, EPI and specific yield

Loss Waterfall — theoretical yield to delivered, costed

Inverters — select one for the device drill-down

InverterVendor / modelkWpStatusEnergyPREPIkWh/kWpAvail.Lost

Guarantee Tracking — actual vs guaranteed yield and the year-end projection

SiteESCOGuaranteed (yr)Due to dateActual YTDΔ kWhAchievedYear-end forecastΔ vs guaranteeStatus

Year-End Forecast vs Guarantee — season-weighted projection per site

Solar Faults — ranked by energy at risk, not just severity

SeveritySiteDeviceFaultkWh at riskSARESCOSLAOpened

ESCO Dispatch Scorecard — on-time completion against contracted SLA

ESCOSLA (h)Work ordersCompletedOn timeOverdueAvg. hours

Cleaning Optimisation — dispatch when recovered energy beats the visit cost

Net benefit is the projected recovery over a 60-day horizon at the site tariff, minus the cleaning cost. Sites with a negative net benefit are better left until soiling accrues further.
SiteESCOSoilingRecoverableValueCostNet benefitPaybackStatus

Soiling Index — performance lost to dust since the last clean

Glossary — every abbreviation used across the platform

These terms are also defined in place: anywhere one appears on screen it carries a dotted underline, and hovering, tabbing to it or tapping it shows the definition.

Availability & Loss Accounting — whose downtime was it?

Two numbers per site. Raw counts every lost kWh — what the building owner actually lost. Contractual removes losses the contract excuses (grid curtailment, owner shutdown, force majeure), and is what the ESCO is measured on. The guarantee target drops by the excluded energy, so a contractor is never charged for generation they were instructed not to produce.
SiteESCORawContractualExcludedContractor lossGuarantee targetReview backlog

Loss Events — classify what the plant lost and why

SiteCategoryStartedLostHoursEvidenceReviewed

Thermographic Inspection — the faults electrical monitoring cannot see

A cracked cell, a bypassed substring or PID sits below every alarm threshold and bleeds a few percent for years. Findings are graded by temperature rise over neighbouring healthy modules (ΔT), not absolute temperature — a black roof in Riyadh runs at 70 °C when perfectly healthy.
SiteCampaignFlownMethodFindingsUrgentSurvey conditions

Open Findings — the repair backlog, worst first

SeverityAnomalySiteModuleΔTEffectAction

Generation Forecast — next 24 hours

Forecast irradiance × capacity × performance ratio × temperature × soiling × degradation. Every term is inspectable — hover a row to see the multipliers. Sites with coordinates use a live hourly irradiance forecast; the cloud slider above is the fallback for sites without one.

Per-site — tomorrow's expected yield

SiteCapacityForecast 24hClear-sky ceilingRatioPeak hourSpecific yield

Forecast Accuracy — measured, not asserted

Normalised by capacity, night hours excluded. Bias is the actionable half: a persistently positive bias means stale soiling or performance-ratio assumptions, and every plan built on the forecast is over-committed.
SiteSamplesnMAEnRMSEBiasVerdictNote

Warranty Position — what is still claimable, and what is about to time out

Product warranty covers an individual defective module; performance warranty covers the array producing below the manufacturer's guaranteed curve for its age. They expire at different times and are argued on completely different evidence.
SiteModule makerAgeProduct warrantyPerformance warrantyClaims

Claims — from thermal finding to RMA

StatusSiteTypeVendorModuleQtyValueRMA

Revenue & Settlement — what the generation is worth, and who has paid

Settlement runs off the exclusion-adjusted target. Charging a shortfall penalty against a target that includes energy the grid operator instructed the plant not to produce would be charging for obedience.

Settlements — per period

SitePeriodDeliveredTargetRateGrossPenaltyNet

Invoices — reconciled against the meter

StatusSiteReferencePeriodEnergyAmountVariance

Zero-Export Spillage — generation the site threw away

On a zero-export site nothing curtails the plant — the inverter simply refuses to push past on-site demand, so this loss appears in no meter at all. It is invisible by construction, and it is the entire business case for storage.
SiteServedSpilledSpilled %Value wasted /yrRecoverable /yrPayback

Batteries — state of health, round-trip efficiency and cycle use

Round-trip efficiency falls before capacity does, so it is the earliest warning of a failing pack. Cycles are equivalent full cycles (throughput ÷ usable capacity) — counting charge events instead inflates warranty consumption several-fold.
SiteBatteryChemistryCapacityRound-tripCycles usedState of healthVerdict

Vendor Connectors — one credential set per ESCO project, normalized into one model

A connector without credentials is not a failure — it is the onboarding backlog. Each row shows exactly which ESCO still owes API access.
SiteVendorModeDevicesCadenceStatusLast successCredentials

Supported Hardware — what Rosetta can read, and what each path needs

Reference data, identical for every tenant. Defined in the codebase rather than editable here: a mistyped temperature coefficient would silently corrupt every performance ratio downstream, so these change by review.

My Dashboard — your KPIs, saved to your account

Pick the metrics that matter to you; they sync wherever you sign in.

Normalization Explorer — how each vendor's raw points map to the unified model

VendorRaw vendor nameRaw refCanonical nameUnitTags
Building:
Legend — equipment abbreviations
AHU · RLT — Air Handling Unit
CH · KAE · Chiller — Chiller (cooling plant)
BLR · KES · Boiler — Boiler (heating plant)
VAV — Variable Air Volume terminal
FCU — Fan Coil Unit
Zone · Raum — Zone / Room
OT — Operating Theatre · ICU — Intensive Care Unit
MSB · Zähler · Main Incomer — Electrical Meter / Switchboard
FACP · BMZ · Fire Panel — Fire Alarm Control Panel (incl. electric / diesel / jockey pumps)
DW · TWW · Domestic Water — Fresh / Domestic Water (tank, booster, metering)
ACS · ZUT · Access Control — Door Controllers / Card Readers
CCTV · VID — Video Surveillance (cameras, NVR)
ELV · AUF · Elevator — Lift / Vertical Transport
CRAC — Computer-Room A/C (precision cooling) · UPS · USV — Uninterruptible Power Supply
PDU — Power Distribution Unit · GEN · NOT — Standby Generator · ENV — Aisle Environment / Leak
Status
Normal / online
2Active alarms on the item
Vendor naming differs — SAUTER uses German codes (RLT, KAE, BMZ…), Honeywell uses Niagara codes (AHU, CH, FACP…), Schneider uses full English. Rosetta normalizes them all to one model.

Comfort by Site — 24h compliance

SiteComfortZones

Overall Comfort Index

Zones — temperature band & CO₂ compliance (last 24h)

ZoneSiteTemp %CO₂ %Overall

Indoor Air Quality & Wellbeing — live CO₂, PM2.5 & humidity by building

BuildingWellbeingCO₂ avgCO₂ peakPM2.5HumiditySensors
Loading…

Wellbeing score deducts for elevated CO₂ (>800/1000/1400 ppm), PM2.5 (>12/35 µg/m³) and humidity outside 30–60%. Aligned to WELL / RESET air guidance.

Comfort Requests — occupant feedback → action

WhenBuildingZoneTypeNoteStatus
Loading…

Maintenance Cost — last 12 months

Cost by Site — 12 months

Technician Workload — open work orders

TechnicianOpen WOsUrgent/High

Most Expensive Assets — 12 months

EquipmentSiteJobsCost

Recent Activity

Predictive Maintenance — condition-based asset health & failure risk

Health blends service wear, recent fault frequency, active alarms and runtime. Remaining life (RUL) projects time‑to‑replacement from asset age vs expected service life, shortened by current health and a rising‑fault trend (↗ improving · → stable · ↘ worsening). Assets are ranked by failure risk so you can act before breakdown.
AssetSiteHealthRiskRemaining lifeNext serviceRisk drivers

Asset Register — manufacturer, model, serial, warranty, expected life & lifecycle status

Click any asset to edit its nameplate and lifecycle details.
AssetSiteMake / ModelSerialAgeWarrantyStatus

Asset Register — health, runtime, next service

EquipmentSiteHealthRuntime 7dFrequencyNext service

Detail

Select an asset to view its maintenance timeline.

Work Orders — any device

PriTaskStatus

Work order detail

Select a work order to manage replacement parts and complete it.

Malfunction Notifications — report issues, review & convert to work orders

PriIssueSite / EquipmentReporterStatus

Parts Inventory — stock & reorder

Part #DescriptionForCostStock

PM Schedule & Timeline — how often each machine is serviced + what's next

EquipmentSiteFrequencyLast serviceNext dueStatusAction

Maintenance History — recent work across the estate

DateEquipmentTypeSummaryParts replacedCostTech

Data Quality — normalized coverage

Define New Element — custom equipment or virtual points

Delete equipment:

Sites & Settings — add a building, edit tariff / EUI / carbon (admin)

SiteTariffTarget EUICarbon %

Connectors & Integration — define the BMS API per building: vendor, protocol, driver, transport & endpoint (admin)

VendorBuildingProtocolDriverEndpointTransportStatusPointsFresh

API Tokens — read-only access to /api/v1

Tokens authenticate external integrations against the public read API. The token value is shown once on creation — store it securely.
LabelPrefixScopeCreatedLast used

Webhooks — outbound event delivery

Rosetta POSTs a signed JSON payload to your URL when subscribed events fire. Payloads carry an X-Rosetta-Signature (HMAC-SHA256 over the body).
URLEventsLast delivery

BI & Warehouse Export — bulk CSV datasets for Power BI, Tableau, Sheets & data lakes

Point your BI tool's web/CSV connector at these URLs using an API token (header Authorization: Bearer <token>, or append ?token=…). Refresh on your tool's schedule for always-current data.

Public API reference — base /api/v1, auth Authorization: Bearer <token>

Tenants — SaaS organisations · system owner view

As the platform owner (super admin) you manage every customer organisation. Each tenant has its own admin who sees only their org.
TenantStatusSitesUsers

Usage & Quotas — resource consumption per organisation vs limits

TenantSitesSeats (users)PointsEquipmentConnectorsActive alarms
Loading…

Quotas are soft by default and enforced at creation time for sites and seats. A blank or 0 limit means unlimited. Only the platform owner can edit quotas.

Users & Roles — admin

NameEmailRoleTenant

Roles & permissions — built-in roles plus your own custom roles

Loading…

Occupancy Schedules — per-site occupied hours & setpoints

SiteDaysOccupied hoursOccupied °CSetback °C

Holiday Calendar — dates a site is treated as unoccupied (held on setback by optimal start/stop)

DateSiteName
Loading…

Audit Log — control actions

TimeActorActionTarget

Database backups — platform owner

Loading…

Settings — configure Rosetta

Jump to any configuration area, set org-wide defaults, or personalize your own experience.

Global Defaults — org-wide (admin)

My Preferences — personal, saved on this device

Two-factor authentication — protect your account with a one-time code

Loading…

Active sessions — devices currently signed in

Loading…

Your data — GDPR data portability

Download a copy of the personal data Rosetta holds about your account (profile, activity, bookings). Secrets are excluded.
⤓ Download my data (JSON)

Device Discovery — scan a protocol network & import normalized points

Pluggable drivers act as live OT/IoT gateways (MQTT, SNMP, KNX, M-Bus, LonWorks). Pick a protocol to scan, review the discovered devices, choose a building and import — points flow into the unified model and go live immediately.
Import into:

Automation Rules — IF inputs THEN outputs, across any vendor

Building Scorecards — ranked composite performance

#SiteScoreGradeEnergyComfortReliabilityFaults

Portfolio Map

Prioritized Opportunities — ranked by avoidable cost

PriIssueSite / EquipmentCategoryAvoidable/yr

Savings by Category

Select an opportunity to see the recommendation.